kkfluous d0984a430b
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
refactor(scheduling): improve reason text, fix classification, polish detail view
- Classification: qualified requires actual completionRate >= 100% (not just predicted)
- Reason text: structured two-column layout (客户日均 | 考核周期剩余)
- Conclusion line in red bold (预估无法达标,需替换 / 已达标,建议换上未达标车辆)
- Remove verbose subtitle from candidate section
- Remove redundant middle line (预估考核期里程 vs 考核里程)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-16 22:32:50 +08:00
Description
羚牛 BI 报表服务
4.2 MiB
Languages
TypeScript 99.9%